UK-London: construction work

Sourced By: http://www.theconstructionindex.co.uk

UK-London: construction work

Directive 2004/17/EC

Section I: Contracting entity

I.1) Name, addresses and contact point(s)

For the attention of: E-mail: London and South Eastern Railway LimitedFriars Bridge Court 41-45 Blackfiars Road Reginald Vanderpuije SE1 8PGLondon UNITED KINGDOM reginald.vanderpuije@go-ahead.com Internet address(es): General address of the contracting entity: www.go-ahead.comFurther information can be obtained from: The above mentioned contact point(s) Specifications and additional documents (including documents for a dynamic purchasing system) can be obtained from : The above mentioned contact point(s) Tenders or requests to participate must be sent to : The above mentioned contact point(s)

I.2) Main activity

Railway services

I.3) Contract award on behalf of other contracting entities

The contracting entity is purchasing on behalf of other contracting entities: no

Section II: Object of the contract

II.1) Description

II.1.1) Title attributed to the contract by the contracting entity:

Design and Build Single Storey Decked Car Park Extension.

II.1.2) Type of contract and location of works, place of delivery or of performance

Works NUTS code UKJ SOUTH EAST (ENGLAND)

II.1.3) Information about a public contract, a framework agreement or a dynamic purchasing system (DPS)

The notice involves the establishment of a framework agreement

II.1.4) Information on framework agreement

Framework agreement with a single operator

II.1.5) Short description of the contract or purchase(s):

To design and construct single storey decked car park extensions on the existing car park footprints at Orpington and Tonbridge railway stations. It will be for the selected supplier to generate optimum designs but the minimum net number of spaces required are 140 (Orpington) and 172 (Tonbridge).

II.1.6) Common procurement vocabulary (CPV)

45000000 Construction work

II.1.7) Information about Government Procurement Agreement (GPA)

The contract is covered by the Government Procurement Agreement (GPA): no

II.1.8) Information about lots

II.1.9) Information about variants

Variants will be accepted: no

II.2) Quantity or scope of the contract

II.2.1) Total quantity or scope:

II.2.2) Information about options

II.2.3) Information about renewals

II.3) Duration of the contract or time limit for completion

Section III: Legal, economic, financial and technical information

III.1) Conditions relating to the contract

III.1.1) Deposits and guarantees required:

III.1.2) Main financing conditions and payment arrangements and/or reference to the relevant provisions governing them:

III.1.3) Legal form to be taken by the group of economic operators to whom the contract is to be awarded:

III.1.4) Other particular conditions:

The performance of the contract is subject to particular conditions: no

III.2) Conditions for participation

III.2.1) Personal situation of economic operators, including requirements relating to enrolment on professional or trade registers

III.2.2) Economic and financial ability

III.2.3) Technical capacity

III.2.4) Information about reserved contracts

III.3) Conditions specific to services contracts

III.3.1) Information about a particular profession

Execution of the service is reserved to a particular profession: no

III.3.2) Staff responsible for the execution of the service

Legal persons should indicate the names and professional qualifications of the staff responsible for the execution of the service: no

Section IV: Procedure

IV.1) Type of procedure

IV.1.1) Type of procedure

Negotiated

IV.2) Award criteria

IV.2.1) Award criteria

The most economically advantageous tender in terms of the criteria stated in the specifications or in the invitation to tender or to negotiate

IV.2.2) Information about electronic auction

An electronic auction will be used: no

IV.3) Administrative information

IV.3.1) File reference number attributed by the contracting entity:

IV.3.2) Previous publication(s) concerning the same contract

IV.3.3) Conditions for obtaining specifications and additional documents

(except for a DPS)

IV.3.4) Time limit for receipt of tenders or requests to participate

9.1.2012 – 17:00

IV.3.5) Language(s) in which tenders or requests to participate may be drawn up

IV.3.6) Minimum time frame during which the tenderer must maintain the tender

IV.3.7) Conditions for opening tenders

Section VI: Complementary information

VI.1) Information about recurrence

This is a recurrent procurement: no

VI.2) Information about European Union funds

VI.3) Additional information:

VI.4) Procedures for appeal

VI.4.1) Body responsible for appeal procedures

VI.4.2) Lodging of appeals

VI.4.3) Service from which information about the lodging of appeals may be obtained

VI.5) Date of dispatch of this notice:

5.1.2012

Comments are closed.

Sites

RSS Software News

  • Tiny Robot 3D Duplicators
    Work is underway designing tiny robotic cubes imbedded with magnets on each plane that can create a duplicate of any object, either equal in size to the original or any size version as required. Massachusetts Institute of Technology’s Robotics department are currently working with two dimensional cubes of four sides, each cube containing a microprocessor wit […]
  • Lumia Hits us for a score of 900
    Mobile Phone Lumia 900 is here to stay. Lumia 900 is here thanks once again to the Finland Company Nokia. This is great news for the mobile phone giant that is presenting this device at a low cost and a streamlined design with a front-facing camera for video conferencing. This is putting it on the same playing field as the likes of Samsung and Apple that now […]
  • Google And Microsoft To Encourage The Future of British ICT Education
    The government has finally agreed that creative and motivating ICT classes be reintroduced to the classroom by teaching children to program and put computer science back in the core of ICT lessons. The Secretary of State for Education, Michael Gove is reported as saying that the present ICT curriculum was ‘demotivating and dull’. Advising Mr Gove on implemen […]

 

May 2012
M T W T F S S
« Apr    
 123456
78910111213
14151617181920
21222324252627
28293031  

RSS Business Travel News

  • Qatar, UAE urge citizens to stay away from Lebanon May 19, 2012
    DUBAI (Reuters) - Qatar and the United Arab Emirates urged their citizens to stay away from Lebanon, citing security concerns in a country where fighting prompted by sectarian tensions in neighbouring Syria has unsettled areas near a northern port. […]
  • Refloat of Italy's Concordia wreck to be biggest ever May 19, 2012
    ROME (Reuters) - Salvage crews will employ huge cranes and air tanks to refloat the half-submerged Costa Concordia cruise liner in the largest ever operation of its kind, according to a plan unveiled on Friday. […]